Ein Rechenmodell zur vergleichenden Beurteilung der Verfahrenskosten bei Bodenbearbeitungsgeräten
1979
Tätä artikkelia/julkaisua ei ole tallennettu Jukuriin. Julkaisun tiedoissa voi kuitenkin olla linkki toisaalle tallennettuun artikkeliin/julkaisuun.
Pysyvä osoite
URI
Kuvaus
Nimekkeen selvennys: Calculation model to compare tillage cost.
Tiivistelmä
High field capacity amd low energy requirements with regard to towed implements are obtained on the one hand by tractor pull capability and reducing draft requirement of the implement, on the other hand by accurate matching operating parameters of tractor and implements. This essay presents a model to calculate the minimum time and/or energy requirement combination of four wheel drive tractors and towed soil tillage implements. The results show how the variables which the farmer can influence (axle horse power, tractor weight, working width, no-slip travel speed) must be determined in order to match the factors concerned to an optimum degree.
ISBN
OKM-julkaisutyyppi
B1 Kirjoitus tieteellisessä aikakauslehdessä
Julkaisusarja
Grundlagen der Landtechnik
Volyymi
29
Numero
5
Sivut
Sivut
162-166
ISSN
0017-4920