Luke
 

Evaluation of the productivity and costs of excavator-based mechanized tree planting in Finland based on automated data collection (Retracted)

Tämän artikkelin/julkaisun kokotekstiä ei ole tallennettu Jukuriin. Julkaisun tiedoissa voi kuitenkin olla linkki toisaalle tallennettuun kokotekstiin.

Kuvaus

This article has been retracted. The authors found the following error in the cost calculations: the total cost of the kilometre allowances for the machine operators was calculated based on the number of sites across all planting chains (e.g., 0.57 €/km × 50 km × 50 sites), whereas it should have been calculated based on the number of shifts during the forest management season (e.g., 0.57 €/km × 50 km × 150 shifts). The correction in the calculations slightly affected the results of the cost analyses, but the conclusions remained the same. Revised article is published: https://doi.org/10.14214/sf.25004

Tiivistelmä

ISBN

OKM-julkaisutyyppi

A1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä

Julkaisusarja

Silva fennica

Volyymi

58

Numero

5

Sivut

Sivut

23 p.

ISSN

0037-5330
2242-4075